|

These
E-Z Access® Crawlspace doors are specially made for manufactured
homes and come ready to install.
Install
5/8 J-molding around 3 sides of the frame (top & 2 sides)
using small self tapping tek screws (not supplied).
| Note:
J-molding on the sides should not extend below the raised
flat portion of the frame. |
 |
With the J-molding installed, the frame will now be the width
of 2 skirting panels.
Insert
bottom of frame into the ground track & install the skirting
into the J-molding.
Replace
the door into frame.
Note: For using with existing skirting
A. Disengage cap lock at the of skirting and remove the two skirting
panels by sliding upwards & out.
B.
Replace skirting panels with frame, engaging existing skirting
into J-molding & bottom of frame into ground track.
C.
Use skirting that was removed earlier to fill in void between
top of frame & cap lock. (Usually the lengths required can
be cut from one skirting panel leaving the other for future use.)
D.
Replace the door.
Although
the plastic contains some inherent UV protection, the level of
protection may be increased by painting. Either latex or oil base
paints (most brands of spray cans) is acceptable with oil base
paints being more durable.
|